Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News


mdpi.com > 2076-16/18/3417 > 8911

Applied Sciences, Vol. 16, Pages 8911: Emotion Analysis in Public Transport

6+ day, 7+ hour ago   (366+ words) recommendations for project enhancement. 16, Pages 8911: Emotion Analysis in Public Transport Applied Sciences...


mdpi.com > 2076-16/18/3417 > 9070

Applied Sciences, Vol. 16, Pages 9070: Dynamic Interaction Mechanism and Mitigation Strategy for High-Speed

2+ day, 5+ hour ago   (379+ words) High-Speed Railway Embankments Crossing Active Ground Fissures Under Double-Track Train Loading Applied Sciences...


mdpi.com > 2076-16/17/3417 > 8567

Applied Sciences, Vol. 16, Pages 8567: Experimental Investigation of Ballasted Turnout Deformation According

2+ week, 3+ day ago   (509+ words) This study experimentally investigated the long-term deformation behavior of a ballasted railway turnout affected by adjacent deep excavation through an integrated multi-sensor field-monitoring approach. The monitored facility consisted of two 60 kg, #10 single turnouts located approximately 13 m from an excavation with…...


mdpi.com > 2076-16/18/3417 > 8976

Applied Sciences, Vol. 16, Pages 8976: An Integrated FMEA–HFACS–Bayesian Framework for Railway Risk Assessment

4+ day, 9+ hour ago   (541+ words) Background: Integrating human factors into quantitative railway risk assessment remains methodologically unresolved. Failure Mode and Effects Analysis (FMEA) records human contributions as a single occurrence rating and cannot represent their organisational antecedents or their interactions. Purpose: This paper is a…...


mdpi.com > 2076-16/16/3417 > 8185

Applied Sciences, Vol. 16, Pages 8185: Development and Parametric Evaluation of a Novel Load Distribution

4+ week, 5+ hour ago   (577+ words) Increasing train speeds and axle loads result in greater demands on the reliability of predictions for vertical bridge accelerations in high-speed rail traffic. Complex multibody models, e.g., in the form of coupling beam models, allow for the explicit consideration of track…...


mdpi.com > 2076-16/17/3417 > 8397

Applied Sciences, Vol. 16, Pages 8397: Occupancy-Aware High-Speed Rail Pricing with Aggregate Data: A

3+ week, 1+ day ago   (319+ words) Aggregate origin–destination data and summary load factors do not identify train-specific flows; imposing each load factor as an exact margin can therefore overstate precision. We develop an auditable high-speed rail pricing framework combining pooled passenger-kilometer entropy completion, an occupancy-aware…...


mdpi.com > 2076-16/17/3417 > 8674

Applied Sciences, Vol. 16, Pages 8674: Ballast Void Formation in Railway Turnouts: A Vehicle–Track Interaction

2+ week, 4+ hour ago   (543+ words) Railway turnouts are subject to disproportionately high maintenance costs, partly driven by ballast void formation under asymmetrically loaded sleepers. Existing turnout models rely on detailed three-dimensional finite element track representations and do not readily support iterative long-term settlement analyses across…...


mdpi.com > 2076-16/17/3417 > 8881

Applied Sciences, Vol. 16, Pages 8881: LSTM-TCN Forecasting for Short-Term Passenger Flow at Integrated

1+ week, 6+ hour ago   (469+ words) Short-term passenger-flow forecasting at integrated transport hubs requires accurate forecasts with explicit target semantics. This study evaluates long short-term memory (LSTM) and temporal convolutional network (TCN) fusion models using two distinct 5 min targets at Shenzhen North Station: a 2023–2026 regional population-mobility…...


straitstimes.com > business > st-engineering-unit-wins-750-million-contract-for-taiwan-metro-line

ST Engineering unit wins $750 million contract for Taiwan metro line

2+ week, 5+ day ago   (276+ words) ST Engineering’s new $750 million contract comes on the back of a $840 million contract win in July....Published Aug 26, 2026, 08:00 PM Updated Aug 26, 2026, 08:12 PM SINGAPORE - ST Engineering’s urban solutions...The mainboard-listed global technology, defence and engineering group said on Aug…...


railway-news.com

Engineering Smarter Rail Solutions for Modern Challenges

4+ day, 9+ hour ago   (282+ words) Modern rail infrastructure demands smarter, more resilient engineering solutions....stabilizing slopes, preventing mud pumping, or reinforcing track beds, the key lies in adopting technologies...

Web

External web results are waiting for the human check. Complete the press-and-hold control above. Google advertising and AI choices remain separate after verification.